- Home
- Government
- General Administration
- Planning Board
- Fees & Information
Fees & Information
| Item | Fee |
|---|---|
| Approval Not Required (ANR) Plan | $50 per lot |
| Preliminary Plan | $100 Plus $500 for 1 to 5 lots, or $100 per lot for 6 or more lots |
| Definitive Plan | $200 if no Preliminary Plan/Form 2B is filed $100 if a Preliminary Plan/Form 2B is filed Plus $500 for 1 to 5 lots or $100 per lot for 6 or more lots Note: These lot fees are waived if paid at the Preliminary Plan Stage Plus $1/linear foot of roadway |
| Residential Compound | $1,000 per application |
| Re-Submissions | $100 per change or re-signing of plans |
| Modification of Definitive Plan | $75 Plus $100 each lot affected Plus $100 each new building lot Plus $50 for modification of a road Plus $50 for modification of drainage structure |
| Special Permit | $175 application fee Plus $75 for modification or extension |
| Site Plan Review | $75 for sites with 10 or fewer parking spaces $125 for sites with more than 10 parking spaces Plus all Planning Board expenses including outside expenses for consultants |
| Repetitive Petition | $75 rehearing from ZBA |
| Revised Application | If there is an increase in lots, the difference between the original number of lot fee and total fee including all new lots must be paid. |
| Engineering Review & Consulting Fee Schedule | Preliminary Plan, Modification of Preliminary Plan, Modification of Definitive Plan, Modification to Special Permit: 2 to 15 lots or units - $2,000 fee 16 to 20 lots or units - $3,000 fee 21 to 25 lots or units - $4,000 fee over 25 lots or units - $5,000 fee |
| Initial Definitive Plan or Special Permit | 2 to 15 lots or units - $4,000 fee 16 to20 lots or units - $6,000 fee 21 to 25 lots or units - $10,000 fee over 25 lots or units - $20,000 fee |
The Planning Board shall not accept an application nor schedule a public hearing without receipt of a $2,000 deposit to be used only for payment of engineering and consulting services related to the proposed project. A minimum balance of $2,000 must be maintained in the project's account. Any money not used for review services will be returned to the applicant at the time of final covenant release.