Fees & Information

ItemFee
Approval Not Required (ANR) Plan$50 per lot
Preliminary Plan$100 Plus $500 for 1 to 5 lots, or $100 per lot for 6 or more lots
Definitive Plan

$200 if no Preliminary Plan/Form 2B is filed

$100 if a Preliminary Plan/Form 2B is filed

Plus $500 for 1 to 5 lots or $100 per lot for 6 or more lots

Note: These lot fees are waived if paid at the Preliminary Plan Stage

Plus $1/linear foot of roadway

Residential Compound$1,000 per application
Re-Submissions$100 per change or re-signing of plans
Modification of Definitive Plan

$75 Plus $100 each lot affected

Plus $100 each new building lot

Plus $50 for modification of a road

Plus $50 for modification of drainage structure

Special Permit$175 application fee Plus $75 for modification or extension
Site Plan Review

$75 for sites with 10 or fewer parking spaces

$125 for sites with more than 10 parking spaces

Plus all Planning Board expenses including outside expenses for consultants
Repetitive Petition

$75 rehearing from ZBA

Revised ApplicationIf there is an increase in lots, the difference between the original number of lot fee and total fee including all new lots must be paid.
Engineering Review & Consulting Fee Schedule

Preliminary Plan, Modification of Preliminary Plan, Modification of Definitive Plan, Modification to Special Permit:

2 to 15 lots or units - $2,000 fee

16 to 20 lots or units - $3,000 fee

21 to 25 lots or units - $4,000 fee

over 25 lots or units - $5,000 fee

Initial Definitive Plan or Special Permit

2 to 15 lots or units - $4,000 fee

16 to20 lots or units - $6,000 fee

21 to 25 lots or units - $10,000 fee

over 25 lots or units - $20,000 fee

The Planning Board shall not accept an application nor schedule a public hearing without receipt of a $2,000 deposit to be used only for payment of engineering and consulting services related to the proposed project. A minimum balance of $2,000 must be maintained in the project's account. Any money not used for review services will be returned to the applicant at the time of final covenant release.